Skip to main content

Ricco - Diversion Diversion

The proposed project will be replacing a push up dam with and engineered rock riffle on Diversion Ditch. This will also include installation of a sheet steel wall, three 4-Log wood structures, pre-fabricated inlet and flush boxes, about 330 feet of 30” HDPE pipe, and the installation of a ramp flume.

Invitation to Bid.pdf