Ricco - Hall Ditch 

The proposed project will be replacing a push up dam with and engineered rock riffle. This will also include installation of a sheet steel wall, two 4-Log wood structures, pre-fabricated inlet and flush boxes, about 370 feet of 30” HDPE pipe, and the installation of a ramp flume.

Invitation to Bid.pdf