2017 Badger Creek Riparian Fence Project
Badger Creek: Two sections of this creek are proposed to be fenced; the "B" reach (upstream) and "E" reach (downstream). The B-reach will protect 1.3 acres of riparian habitat with 0.6 miles of fence; the E-reach will protect 7.3 acres of habitat with 0.7 miles of fence.